Playhouse Made Modern - Deck & Framing
Equipment and lumber used to build the deck and framework of our DIY playhouse.
Equipment
Miter saw
Pencil
Combo Square
Tape measurer
Impact Drill
Drill
Drill bit (for lag screw pilot holes)
Kreg Jig
Shovel
Level
Materials
Deck
4 -
4x4 Pressure Treated
48"
18 -
2x6
@ 92 5/8" (stud length)
1 -
2x4
@ 92 5/8" (stud length)
5 -
2x6
@ 93"
8 -
2x4
@ 21" w/ 45
°
inward angles each end
3.5"
Lag screws
2.5"
Decking screws
2 -
50lb bag
Concrete
Walls
13 -
2x4
@ 56"
4 -
2x4
@ 57"
4 -
2x4
@ 64"
3 -
2x4
@ 88.5"
2 -
2x4
@ 48"
1 -
2x4
@ 16"
1 -
2x4
@ 21"
2 -
2x4
@ 10"
2 -
2x4
@ 16"
1 -
2x4
@ 56.5"
Approx. 200 -
2.5"
Kreg Screws (Blue Kote)
Approx. 30 -
2.5"
Decking screws
Roof
4 -
2x4
@ 10'
8 -
2x2
@ 20"
4 -
2x2
@ 21"
24 -
2.5"
Kreg Screws - Blue Kote
Approx. 16 -
2.5"
Decking screws
Notes
This list is only the materials used for the deck and framework. It does not include materials needed for siding, roofing, or the railing.